SCS_a078_voltageMatchTimeout

Stage allocation timed-out during the voltage matching part of the sequence.

Live incidence rate

<0.01% (Extremely rare)

Vehicle messages

None displayed

Impact

Stage will not connect to desired post, resulting in reduced power availability.

Description

Stage allocation timed-out during the voltage matching part of the sequence.

Cause

Voltage matching took too long to complete and stage allocation timed out.

Clear condition

Voltage matching is successful and stage has connected to desired post.

Models

Cybertruck, Model 3 2017-2023, Model 3 2024+, Model S 2021+, Model X 2021+, Model Y, Model Y 2025+

Visibility

service

Want to track your firmware alerts, trips and more?

Sign up for Tessie. Try it free for 14 days. Happiness guaranteed.